Westenberg Engineering in cooperation with the Physikalisch-Technischen Bundesanstalt developed a new inlet nozzle, pre-chamber, blow-off unit, flow straightener and screens for the existing wind tunnel of the CRTEn Institut in Tunisia.

In addition the wind tunnel now can be controlled via computer by the Flow Calculation System, which simultaneously is the certified for the devices under test.

 

CRTEn Institut

Research and Technology

Centre of Energy

Hammam-Lif 2050

Tunisia